Bill Millis / Deputy Director / City Engineering
Visit the Stillwater Infrastructure Map to see where city infrastructure projects are happening.
Full-Depth Repair: This project is reserved for repairing various spot locations throughout the city where the pavement has failed. Most locations involve the rehabilitation or replacement of streets on a full city block (minimum). However, locations exist throughout the city where the pavement is in fair/good condition, but there is that one spot that has failed.
This project does not, however, get down to the pothole size repairs that are covered by the Public Works. Examples of project examples from the FY18 program include the reconstruction of the intersection at Duck and Miller; the pavement repair on 19th Avenue (west of Sangre); the repair to the pavement and stormwater system on Jardot (south of Virginia.
Edge Drain: The City is adding edge drain to areas that have a constant water source saturating the pavement subgrade and weakening the pavement structure.
Locations: Various locations throughout the City
Anticipated Date (Design): 5.20.2019
Anticipated Date (Construction): 10.15.2019
Anticipated Date (Completion): 6.30.2020
Full-depth repairs help to increase the overall rating of a street, prevent deterioration of adjacent section of the street and in the case of edge drains prolongs the life of the street.
Funded: FY2019
Funding Source: Transportation Sales Tax Fund
Project Budget: $610,000
Expenditure to date: $474,966
Content Last Reviewed: 02.05.2021
![]() |